Requirements of Building Inspections Melbourne

Requirements of Building Inspections Melbourne

Whatever building you build and for whatever purpose, it has to adhere to certain rules and regulations of the state where you plan to build the structure. Failing which, your project may be terminated by the authorities or you may have to pay a major fine for the error. This is one of the primary reasons why builders and homeowners go for building inspections while building a brand new house or before purchasing a new property.

Types of Building Inspections

When it comes to building inspections at https://www.house-inspections.com.au, there are several types to it. However, if you are making a new construction, there are some types of inspections that should be done at all costs. Some of these essential types of inspections are described below.

  • Basement Wall or Foundation Inspections: This type of inspection is carried out once the basement walls or the foundation of a building has been laid down properly. All types of reinforcing steel and form of designed structural elements must also be in place. It is important to carry out this inspection before any type of concrete placement.
  • Footing Inspections: This is the first form of building inspection that is carried out. It is generally made even before the piers or poles are set and sometimes after basement areas or trenches have been excavated. Footing inspections can also be carried out after necessary reinforcing steel has been placed and forms erected. In order to carry out footing inspection properly, it is necessary for all the corners of the property clearly marked. This is important to make sure that all zoning setback needs are fulfilled.
  • Masonry and Framing Inspections: This type of building inspection is started from the roof and is carried out to ensure that the entire framing, masonry, bracing, and fire stopping are properly in place. It also checks to ensure that all plumbing, electrical, vents, heat ducts, and chimneys are installed correctly before the concealment process commences.
  • Rough Mechanical, Electrical, and Plumbing Inspections: This part of a building inspection is normally carried out at the time of the completion of the construction. This is because the masonry and framing inspection that were made before the concealment of the plumbing, electrical, chimneys, vents, and any other equipment have been already done behind drywall and insulation walls.
  • Wallboard or Lath Inspections: Once all the wallboarding and lathing of the interior section are completed, the wallboard or lath inspections are carried out. However, it made before any the fasteners and wallboard joints are taped and finished or applying the plaster.
  • Inspection of The Public Pre-Sidewalk: This part of the inspection is carried out once the excavation is completed along with base preparation and placement of forms are done. However, it is done before placing the concrete.
  • Final Inspection: As the name suggests, this part of the inspection is carried out once the construction of a building is complete and it is ready for occupancy. However, it is to be carried out before occupancy. The sidewalks, final yard grading, and the house numbers should be attached before this final inspection is carried out.